An innovative process for the gasification of civil / industrial wastewater treatment dried waste sludge based on two-chamber gasification
The purpose of the Waste-to-energy LIBPF process model is to simulatean innovative waste-to-energy process based on a dual chamber gasification, where a fluid bed circulates between an exothermic oxidation chamber and an endothermic gasification chamber. In this way a low inert-gas syngas and a carbon dioxide-rich exhaust flue gas flow are generated in the two separate chambers, according to the Process Flow Diagram:
If you want to know more on this process you can read the accompanying 2-pages abstract of the thesis "Energy upgrading of civil / industrial wastewater treatment of dried waste sludge" by Gianluca Binello, DICAT/UNIGE.
Have a look at the C++ source code, download the sample results in the form of the mass and energy balance table or download and play with the interactive model developed with LIBPF 0.9:
The demo requirements are:
-
operating system: Window 2000, XP, Vista or W7
-
Administrator access to the computer during installation
-
[optional] Excel 2003 or later for displaying the mass and energy balance table
-
[optional] OpenOffice 3.0 or later for displaying the mass and energy balance table